Coverage of KDOT Lettings
The coverage of the KDOT lettings is compiled from publicly available sources.
-
KDOT Lettings: October 2023
Awarded Bids announced on November 6 are highlighted in red
Awarded Bids announced on November 30 are highlighted in blueFederal-Aid
23 TE 0500-01: Sidewalk improvements in Lecompton Julius Kaaz Construction Co. Inc., Leavenworth, $1,219,680.50.
18-99 KA 7088-01/18-81 KA 7043-01: 1-inch milling and 1.5-inch HMA overlay on K-18 from K-177 to K-99 in Riley and Wabunsee Counties (Riley County segment is Non-FA) Shilling Construction Co. Inc., Manhattan, $3,301,695.00.
105 U 2436-01: Replace the Thorn Drive bridge over Davis Creek in the Argentine District Pyramid Contractors Inc. and Pyramid Properties Inc., Olathe, Kansas, $1,426,193.45.
9-15 KA 7150-01/9-62 KA 7083-01: 1-inch milling and 2-inch overlay from US 24 to the West City Limits of Concordia, and a 2-inch milling and 2-inch overlay from the West City Limits of Concordia east 2090 feet in Mitchell and Cloud Counties (Mitchell County segment is non-FA) Shilling, $6,504,239.90.
45 KA 7072-01: 1-inch milling and 1.5-inch overlay on US 36 from the west junction with K-128 east to Mankato; 1/2-inch milling and 1.5-inch overlay on K-128 from the east junction with US 36 north to the Nebraska State Line; 1.5-inch milling and 1.5-inch overlay on K-128 through Burr Oak. APAC-Kansas Inc Shears Division, Hutchinson, Kansas, $4,941,597.27.
4-64 KA 3944-01: Replace a bridge over Level Creek just north of the K-4/K-149 junction. Detour via K-149, US 56, and K-177. King Construction Company Inc & Subsidiaries, Hesston, $1,472,433.61.
283-69 KA 7151-01: 1.5-inch milling and 1.5-inch overlay from Norton north to the Nebraska State Line. APAC-Kansas, $2,866,160.10.
25-77 KA 6737-01: 3-inch milling, 3-inch inlay, and a 1.5-inch overlay from US 36 to the Nebraska State Line. APAC-Kansas, $5,664,524.84.
54-1 KA 7153-01: Ultrathin bonded asphalt surfacing from La Harpe to the Allen/Bourbon County Line. Bettis Asphalt & Construction Inc., Topeka, $1,694,533.56.
400-37 KA 7154-01: 1.5-inch surface recycle and ultrathin bonded asphalt surfacing from the Butler/Greenwood County Line to the east junction with K-99. Pearson Construction LLC, Wichita, $4,655,369.70.
59-67 KA 5727-01: Replace the US 59 bridge over the Neosho River south of Erie. Detour via K-39, US 169, and K-47. A M Cohron & Son Inc., Atlantic, Iowa, $11,221,481.76.
54-8 KA 7158-01: 2-inch milling and 2-inch Overlay from the east Junction with US 400 north to El Dorado. Pearson, $2,001,378.06.
54-87 KA 7160-01: Concrete pavement patching on Kellogg from Hillside to Rock Road in Wichita
54-87 KA 7193-01: Pavement marking replacement on Kellogg from I-135 to Rock Road in Wichita
Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $5,366,208.77.87 N 0711-01: Reconstruction of Meridian Avenue from 1/4 mile south of 69th Street to the BNSF crossing, and from Main Street to 5th Street in Valley Center. Includes a new roundabout at 69th and Meridian. Pearson, $9,381,218.15.
54-13 KA 5431-01: Reconstruction of the intersection of Front Street and Oak Street in Minneola. Smoky Hill LLC, Salina, $960,680.94.
83B-28 KA 5707-01: Replace the US 83B bridge over the Arkansas River south of Garden City. Detour via US 83 and US 50B. Reece Construction Company, Inc., Salina, $9,298,723.71.
23-35 TE 0487-01: Streetscape improvements on a two-block segment of Main Street in Cimmaron. Ebert Construction Co. Inc. & Subsidiary, Wamego, $1,153,922.32.
56-41 KA 5997-01: Reconstruction of a short section of La Lande Avenue in Cimmaron
Federal-Aid, Local projects
14 C 5149-01: Replace the Valleyview Road Bridge over the tributary to Mall Creek. Reece, $383,996.89.
59 C 5137-01: Replace three culverts on 27th Avenue north of Canton
79 C 5150-01: Replace the Xavier Road bridge over Riley Creek near Talmo. King, $560,912.70.
103 C 5115-01: Replace the Ness road bridge over Woodruff Branch near Buffalo B & B Bridge Company LLC, St. Paul, Kansas, $642,500.60.
104 C 5154-01: Replace the 165th Road bridge over Turkey Creek northwest of Yates Center B & B Bridge Company, $661,821.00.
18 C 5155-01: Replace the 222nd Road bridge over the BNSF Railroad. Reece, $2,821,828.85.
39 C 5148-01: Replace the NW 80th Road bridge over Rush Creek southwest of Harper. Reece, $405,038.88.
Non-FA
92-52 KA 7100-01: 1-inch milling and 1.5-inch HMA overlay on K-92 from the Jefferson/Leavenworth County Line to 15th Street in Leavenworth. J M Fahey Construction Company, Grandview, Missouri, $3,869,854.00.
24-75 KA 7102-01: Scrub and Chip seal on eastbound US 24 in southwestern Pottawatomie County Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $493,439.89.
25-77 KA 6995-01: 1.5-inch milling and 1.5-inch HMA overlay on K-25 from the Thomas/Rawlins County Line to Atwood. APAC-Kansas, $3,136,620.81.
83-106 KA 5585-01: Fiber optic cable run on US 83 from Oakley to the Nebraska State Line. Ideatek Telcom, Buhler, Kansas, $4,659,649.17.
223-106 KA 7139-01: 2-inch Overlay on the entire length of K-223. APAC-Kansas, $723,420.55.
160-106 KA 7079-01: Chip Seal on US 160 from Longton to Independence. Vance Brothers, $1,172,062.91.
400-103 KA 6883-01: Lighting upgrade at the north junction of US 400 and US 75 southwest of Neodesha. Phillips Southern Electric Company Inc., Wichita, Kansas, $320,220.00.
75-103 KA 6924-01: Microsurfacing on US 75 in northern Wilson County. Vance Brothers, $1,163,361.00.
160-4 KA 7051-01: Ultrathin Bonded Asphalt Surfacing from Medicine Lodge to the Barber/Harper County Line. APAC-Kansas, $2,193,709.73.
196-8 KA 6992-01: Scrub Seal and Chip Seal from the Harvey/Butler County Line to K-254 Circle C Paving and Construction LLC, Goddard, Kansas, $1,196,650.56.
4-83 KA 6998-01: Chip Seal on K-4 from the Ness/Rush County Line to US 183 in La Crosse. Heft and Sons LLC, Greensburg, Kansas, $1,149,603.00.
135-87 KA 6934-01: Bridge repair on the northbound I-135 bridge over 85th Street. Reece, $269,705.71.
54-87 KA-6936-01: Bridge Deck repair on the 343rd Street Bridge over US 54-400 near Garden Plain. Reece, $514,186.02.
96-87 KA 7162-01: 1.5-inch milling and 1.5-inch overlay from Maize Road to the Arkansas River Bridge. Pearson, $3,805,812.30.
55-96 KA 6436-01: Reconstruction of 4th Avenue in Belle Plaine. Thru traffic detoured via US 81, K-53, and K-15. Pearson, $2,172,564.95.
54-76 KA 5784-01: Passing lane extension on US 54-400 near SW 120th Avenue in Pratt County. Venture Corporation, Great Bend, $5,972,226.14.
-
KDOT Lettings: September 2023
Awarded bids announced on September 29 are highlighted in red. Awarded bids announced on November 6 are highlighted in blue.
Federal-Aid
23 TE 0496-01: Pedestrian & bicycle paths along 11th Street from High Street to Ames Street, High Street from 2nd Street to 4th Street, and 2nd Street from Fremont Street to US 56 all in Baldwin City. Killough Construction Inc., Ottawa, $674,955.08.
105 N 0728-01: Reconstruction of 98th Street from Kansas Ave to the North City Limits of Edwardsville. McAnany Construction Inc., Shawnee, $5,624,162.30.
9-58 KA 7038-01: 1.5-inch milling and 1.5-inch HMA overlay on K-9 from K-9/K-99 junction north of Frankfort east 4.47 miles to K-9/K-87 junction. Hall Brothers Inc., Marysville, $1,175,416.00.
75-63 KA 6448-01: Reconstruction of Penn Street in Independence from Morningside Drive to the north city limits Mission Construction Co. Inc., St. Paul, Kansas, $612,646.85.
77-18 KA 6766-01: Repair of the US-77 bridge over the BNSF Red Rock Subdivision on the south end of Arkansas City.
Federal-Aid, Local Projects:
70 C 5146-01: Replace the Stanley Road bridge over 110 mile creek north of Quenemo. King Construction Company Inc & Subsidiaries, Hesston, $1,260,666.80.
89 C 5033-01: Traffic signals on Topeka Blvd. at 57th, University & Gary Ormsby Drive near Forbes Field. J Warren Company Inc., Topeka, Kansas, $1,759,278.50.
6 C 5152-01: Bridge replacement 1 mile west AND 2.8 miles north of Pawnee Station. Mission Construction Co Inc., St. Paul, Kansas, $299,833.00.
Non Federal-Aid:
106 KA 7109-01: Scrub and chip seal on US 36 from west city limits Hiawatha east to east city limits Troy, US 36 from north city limits of Wathena east to the Missouri State Line, and US 73 in Hiawatha. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $1,792,246.60.
70-21 KA 7141-01: Concrete patching on I-70 from 2.3 miles east OF K-43 to the Dickinson/Geary County line. Prado Construction LLC, Valley Center, $2,032,974.50.
31 KA 7123-01: 1.5-inch milling and 1.5-inch HMA overlay on K-57 from 1,250 FT east OF the south US-77/K-57 junction to Junction City north city limits, on US-77 from 740 FT south of to 1,760 FT north of Rucker Road, and of US 77 from 100 FT S to 600 FT north of Lacy Drive. Shilling Construction Co. Inc., Manhattan, $2,067,478.15.
28-106 KA 7056-01: Chip seal on the entire length of K-28 in Jewell and Cloud Counties. Heft and Sons LLC, Greensburg, Kansas, $818,311.00.
83-55 KA 7002-01: Bridge repair on the US 83 bridge over the Smoky Hill River. L & M Contractors Inc., Great Bend, $259,709.50.
69-6 KA 7178-01: Crack repair on US 69 southbound from 2.094 miles north of the Crawford/Bourbon County Line north 3.81 miles. Pavement Pro’s LLC, McPherson, $82,780.00.
69-61 KA 6055-02: Guardrail upgrades on US 69 from Linn Valley to Louisburg. Bettis Asphalt & Construction Inc., Topeka, $841,828.75.
169-61 KA 6241-02: Guardrail upgrades on US-169: from Baptiste Drive in Paola to 1.4 miles south of the Miami/Johnson County Line. Bettis, $686,153.00.
106 KA 7173-01: Mudjacking at various locations in KDOT District 4 Nortex Concrete Lift & Stabilization Inc., Fort Worth, Texas, $135,016.00.
54-104 KA 6726-01: Bridge repair on the US 54 bridges over Cherry Creek and the Cherry Creek overflow channel ~ 6 miles east of Yates Center. Mission, $879,901.40.
42-48 KA 6939-01: Bridge repair on K-42 bridges 067 and 046 in Kingman County. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $83,179.19.
281-106 KA 7085-01: Chip seal on US 281 from K-19 junction to SE 30 Road, 2-inch milling, and 2-inch HMA overlay from SE 30 Road to the south city limits of Great Bend. Venture Corporation, Great Bend, $1,569,990.60.
106 KA 7048-01: 1.5-inch surface recycle and chip seal on the entire length of K-55, except in the city of Belle Plaine in Sumner and Cowley Counties.
56-29 KA 6776-01: Bridge repair on the US 56/283/400 bridge over the Arkansas River on the southeast side of Dodge City. PBX, $293,370.03.
-
KDOT Lettings: August 2023
Approved bids announced on September 6 are highlighted in red.
Approved bids announced on September 29 are highlighted in blue.Federal-Aid:
16-44 KA 7042-01: 1-inch milling and 2-inch HMA overlay on K-16/K-92 from US 59 south of Oskaloosa to the east junction of K-16 and K-92 in McLouth. Bettis Asphalt & Construction Inc., Topeka, $1,876,751.08.
35-56 KA 7142-01: Pavement marking from the Emporia Turnpike Interchange to the east US 50 junction on the east side of Emporia. Roadsafe Traffic Systems Inc., Chicago, Illinois, $370,537.54.
36-66 KA 3880-01: Replacement of the bridge over the North Folk Vermillion River west of Baileyville. Traffic is to be carried on a Shoo-Fly detour. Reece Construction Company, Inc., Salina, Kansas, $4,205,908.88.
18-81 KA 5469-01: Full-depth reconstruction of K-18/K-177 from the Kansas River bridge to the east junction of K-18/K-177 near Manhattan. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $3,807,986.55.
70-89 KA 7143-01: Pavement marking from I-470 to MacVicar and from Adams to the East Topeka Interchange
(project withdrawn as of 8/17)156-27 KA 7103-01: 1-inch milling and 1.5-inch HMA overlay from Ellsworth to I-70. APAC-Kansas Inc Shears Division, Hutchinson, $3,644,938.47.
53 C 5120-01: Pavement marking and installation of “No Passing Zone” signs on major collector roads in Lincoln County. Roadsafe, $158,791.52.
283-33 KA 7105-01: 2.5-inch surface recycle and chip seal from D Road to Hill City. Dustrol Inc., Towanda, $2,160,215.17.
74 C 5130-01: Signage upgrades on major collector roads west of US 183. KOMO Construction LLC / DBA A&H Co., $481,817.00.
36-77 KA 5987-01: Reconstruction of US 36 in Atwood from 5th Street to 7th Street.
75-16 KA 7090-01/75-104 KA 7089-01: 1.5-inch milling and 1.5-inch HMA overlay from Yates Center to MP 58. Bettis, $2,788,013.36.
106 TE 0402-07: Construction of the Flint Hills Trail between Iowa Road and Louisiana Terrace west of Ottawa. “Mail Order” truss bridge over the BNSF Emporia Sub. Dondlinger & Sons Construction Co. Inc., Wichita, $4,942,584.51.
54-49 KA 5783-01: Extend an existing passing lane on US 54-400 east of Greensburg
54-49 KA 5785-01: New Passing lane on US 54 west of Mullinville
19-73 KA 7093-01/19-93 KA 7094-01: 3/4-inch milling and 1.5-inch HMA overlay on K-19 from the K-19 spur to US 281, as well as on the K-19 spur.
14-80 KA 7041-01: 3/4-inch milling and 1.5-inch HMA overlay on old K-14/K-96 from Avenue T north of Sterling to Lyons
54-76 KA 5784-01: Extend an existing passing lane on US 54-400 approximately 2 miles east of the Pratt/Kiowa County line
166-96 KA 7091-01/166-18 KA 7092-01: 2-inch milling and 2-inch HMA overlay from 5 miles west of the Sumner/Cowley County line east to Arkansas City. Pearson Construction LLC, Wichita, $2,996,297.30.
156-28 KA 6440-01: Reconstruction of a two-block section of Kansas Avenue in Garden City Smoky Hill LLC, Salina, Kansas, $1,413,165.31.
54-60 KA 5782-01: Construct new passing lanes northeast of Meade. J & R Sand Company Inc., Liberal, $8,418,824.59.
54-60 KA 5781-01: Construct new passing lanes southwest of Plains. J & R Sand, $6,544,945.65.
Federal-Aid, local projects
11 C 5153-01: Replace bridge over Brush Creek southeast of Columbus. B & B Bridge Company, LLC, St. Paul, Kansas, $888,661.00.
63 C 5128-01: Reconstruction of Buckeye Road South of Coffeyville. B & B Bridge, $1,596,962.40.
17 C 5129-01: Reconstruction of Road 4 and Avenue G in Comanche County APAC-Kansas, $540,237.05.
Non-FA:
238-22 KA 7101-01: 1.5-inch milling and 1.5-inch HMA overlay along the entire length of K-238. Herzog Contracting Corp., Saint Joseph, Missouri, $582,608.70.
10-23 KA 6977-01: Slide repair at the K-10/E 1900 Road interchange. Kings Construction Co. Inc., Oskaloosa, $1,999,379.65.
214-42 KA 7099-01: Chip seal along the entire length of K-214. Vance Brothers Inc. And Subsidiary, Kansas City, Missouri, $101,564.47.
135-59 KA 6752-01: Repair the I-135 bridges over the K&O Railroad near McPherson. Wildcat, $918,781.50.
255-26 KA 7104-01: 2-inch milling and 2-inch HMA overlay on the entire length of K-255. Venture Corporation, Great Bend, $414,150.60.
54-6 KA 6884-01: Lighting upgrades at the north junction of US 54 and US 69 in Fort Scott. Phillips Southern Electric Company Inc., Wichita, $396,512.00.
35-16 KA 6901-01: Repair the northbound I-35 bridge over US 75 at BETO Junction. PCI Roads, LLC, Saint Michael, Minnesota, $83,609.00.
75-103 KA 7098-01: Chip seal from Neodesha to 1600 Road. Circle C Paving And Construction LLC, Goddard, $682,520.56.
8 KA 7044-01: Replace the expansion joint material on two bridges in Butler County, one on US 54, the other on K-254. PCI Roads, $38,730.00.
50-40 KA 6938-01: Repair of a culvert on Old Trail road in Newton near the north junction of US 50 and I-135.
-
KDOT Lettings, July 2023
There are 23 projects up for bids on July 19. Awarded bids announced on August 3 are highlighted in red. Awarded bids announced on September 6 are highlighted in blue
Federal-Aid:
46 N 0703-01: Sidewalk improvements on Center Street between Shawnee and McKinley Streets in Gardner. Primetime Contracting Corp., Riverside, Missouri, $199,634.00.
470-89 KA 5766-01: Replace the bridge over I-70 on the ramp from Westbound I-470 to westbound I-70 in West Topeka. Detour via Eastbound I-70 and turning around at Wanamaker. A M Cohron & Son Inc., Atlantic, Iowa, $7,691,334.98.
77 C 5134-01: Major collector signage upgrade in Rawlins County east of K-25. Signs Up LTD Haren’s Trees and Critters, Webster City, Iowa, $498,471.48.
169-63 KA 5989-01: Reconstruction of Walnut Street between Eldridge Street and 15th Street in Coffeyville. J Graham Construction Inc., Coffeyville, $1,241,166.00.
235-87 KA 6918-01: Pavement Marking on I-235 from I-135 on the South end to Broadway on the north end. (re-let from May 2023) Century Fence Co., Pewaukee, Wisconsin, $1,684,404.60.
25-102 KA 6444-01: Reconstruction of Fourth Street between Broadway and I Street in Leoti. Morgan Brothers Construction, Inc., La Crosse, $472,692.02.
Non-FA:
99-56 KA 6991-01: Scrub Seal and Chip Seal on K-99 from K-170 to US 56
170-106 KA 6988-01: Scrub Seal and Chip Seal on the entire length of K-170 in Lyon and Osage County
Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $1,523,196.08.106 KA 7127-01: Rumble Strip grinding on US 81 from the Ottawa/Cloud county line to Eagle Road and on I-135 from the McPherson/Saline County Line to I-70. Surface Preparation Technologies LLC, New Kingstown, Pennsylvania, $105,255.00.
60-69 KA 7000-01: Chip seal along the entire length of K-60. APAC-Kansas Inc. Shears Division, Hutchinson, $187,992.33.
281-71 KA 7004-01: Chip Seal on US 281 from 270th Drive to the South City Limits of Osborne. Circle C Paving and Construction LLC, Goddard, $597,578.39.
91 KA 7058-01: Milling and overlay on a small loop road at the eastbound I-70 rest area west of Goodland. McCormick Excavation & Paving LLC, Stratton, Colorado, $393,526.00.
14-48 KA 6922-01: Crack Sealing on K-14 from K-42 to Kingman. Pavement Pro’s LLC, McPherson, $105,454.70.
15-40 KA 6997-01: Chip Seal on K-15 from North Newton to the Harvey/Marion County Line. Circle C, $358,066.63
50-78 KA 6790-01: Lighting upgrades at the US 50 interchange with Scott Boulevard. Phillips Southern Electric Company Inc., Wichita, $245,849.00.
4-80 KA 6916-01: Crack Sealing on K-4 in Rice County. Pavement Pro’s, $228,196.58.
54-87 KA 6179-01: Fiber installation along Kellogg in Wichita. Phillips Southern, $2,344,716.00.
54-87 KA 6770-01: Repair the westbound Kellogg bridge over the Big Ditch. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $1,178,719.00.
96-87 KA 7060-01: 1-inch RCI and 3-inch overlay on K-96 between Greenwich and Kellogg. Pearson Construction LLC, Wichita, $7,272,379.23.
81-96 KA 6921-01: Crack Sealing along US 81 in Northern Sumner County. Pavement Pro’s, $145,776.07.
96-36 KA 6994-01: Scrub seal and chip seal from K-27 to the Greeley/Wichita County Line. Heft and Sons LLC, Greensburg, $725,761.44.
156-42 KA 7003-01: Chip seal from the Finney/Hodgeman County Line to 214 Road. Heft and Sons, $689,668.00.
95-86 KA 6996-01: Scrub seal and chip seal along the entire length of K-95. Heft and Sons, $383,363.69.
-
KDOT Lettings: June 2023
There are only 12 projects up for letting in June. The biggest one happens to be the lead-off project. Approved bids announced on June 29 are highlighted in red.
Federal-Aid
24-44 KA 3542-01/24-89 KA 3236-01: Full-depth reconstruction of US 24 from Topeka Boulevard to Grantville in Shawnee and Jefferson Counties. Koss Construction, Topeka, $64,410,372.73.
70-91 KA 6777-01: Repair of the two I-70 bridges at the east junction with US 24B in Goodland. Reece Construction Company, Inc., Salina, $1,140,402.60.
11 C 5135-01: Major collector signage upgrade on Major collector roads east of K-7 in Cherokee County. Martin Outdoor Enterprises Inc., Pittsburg, $198,755.00.
254-8 KA 6981-01: Pavement Marking replacement from the Sedgwick/Butler County Line to Boyer Road. Cillessen and Sons Inc., Kechi, $687,620.31.
83-106 KA 6234-01: Install a fiber optic broadband cable along US 83 between Garden City and Oakley
Federal-Aid, Local project
57 C 5127-01 Add a paved turnout on Indigo Road near 130th Street south of Hillsboro. Pearson Construction LLC, Wichita, $143,596.00
Non-FA:
35-46 KA 6074-02: Guardrail upgrade near the 151st/K-7 interchange and the 159th/Lone Elm interchange. Bettis Asphalt & Construction Inc., $643,289.00
14-53 KA 6854-01: ADA Sidewalk ramp upgrades along 6th Street (K-14) in Lincoln. Multicon Inc., Park City, $175,162.00
36-101 KA 6779-01: Repair US 36 bridges over Camp Creek and Mill Creek west of Washington. PCI Roads, LLC, Saint Michael, Minnesota, $728.197.96
169-1 KA 6885-01: Lighting upgrade at the US 169/US 54 interchange in Iola. Cooper Construction LLC, Emporia, $325,376.35
47-67 KA 6855-01: ADA Sidewalk ramp upgrade on Carroll Street in St. Paul. Martin, $56,000.00
-
KDOT Lettings: May 2023
There are 22 projects up for letting on May 24, and we lead off with a South Lawrence Trafficway related project. Awarded bids announced on June 7 are highlighted in red. Awarded bids announced on June 29 are highlighted in blue.
Federal-Aid:
40-23 KA 2841-02: Reconstruct the existing SLT/6th Street (US 40) interchange as a DDI. Part of US 40 closed on the west side of the interchange, detour via K-10 and I-70. King’s Construction Co. Inc., Oskaloosa, $14,017,220.08.
24-23 KA 6282-01: Lighting upgrade at the “Teepee Junction” US 24/US 40/US 59 intersection in North Lawrence. J Warren Company Inc., Topeka, $240,763.00.
89 TE 0505-03: New Shared-use path along NW Tyler Street in North Topeka. Kansas Heavy Construction LLC, Shawnee, Kansas, $415,272.50.
40B-31 KA 5996-01: Reconstruction of part of Washington Street near the I-70 interchange, including the roundabout at the westbound I-70 on/off ramps
70-31 KA 6062-01: Full-depth reconstruction on I-70 between Washington Street and K-57
70-31 KA 6773-01: Repair the westbound I-70 bridge over Franks Creek near Grandview Plaza
Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $30,036,834.95.24-97 KA 6438-01: Full-depth reconstruction of 4th Street from Walker Avenue to Riddle Avenue in Colby as a three-lane street with a center turn lane. Sporer Land Development Inc., Oakley, $1,954,962.50.
166-18 KA 6917-01: Pavement Marking from the north/east junction with US 77 to the Cowley/Chautauqua County Line. Cillessen and Sons Inc., Kechi, $396,993.11.
235-87 KA 6918-01: Pavement Marking on I-235 from I-135 on the South end to Broadway on the north end.
160-96 KA 3888-01: Replacement of the US 160 bridge over Hagris Creek in Wellington. Dondlinger & Sons Construction Co. Inc., Wichita, $3,564,404.00.
106 KA 6268-01: Signage replacement on US 54, US 160, K-23, and K-98 in Meade County. Signs Up LTD DBA Haren’s Trees and Critters, Webster City, Iowa, $408,274.34.
Federal-Aid, Local project:
98 C 5151-01: Replace a bridge on 200 Road over the North Fork Saline River northwest of WaKeeney. King Construction Company Inc. & Subsidiaries, Heston, $622,094.90
Non-FA:
75-70 KA 6736-01: Repair four bridges on US 75 between BETO Junction and Olivet. Wildcat Construction Co. Inc. & Subsidiaries, $937,415.50.
99-99 KA 6943-01: 1.5-inch milling and 1.5 inch HMA overlay on a section of Old K-99 near the K-18 intersection that is being retained as a county road. Shilling Construction Co. Inc., Manhattan, Kansas, $185,448.00.
70-85 KA 6893-01: Lighting upgrade at the Westbound I-70 rest area near Salina. Phillips Southern Electric Company Inc., Wichita, $89,217.00.
83-97 KA 6713-01/83-55 KA 6714-01: 2-inch milling and 2-inch HMA Overlay on US 83 from US 40 to 10 miles north of the Logan/Thomas County Line. McCormick Excavation & Paving LLC, Stratton, Colorado, $3,057,893.53.
106 KA 6919-01: RAP Sample milline at various locations in KDOT District 3. Dustrol Inc., Towanda, $21,127.50.
135-40 KA 6731-01: Repair the 60th Street bridge over I-135 in southern Harvey County. Wildcat, $94,432.25.
61-78 KA 6911-01: 3-inch Profile mill and overlay on a settling approach to the K-61 bridges over 85th Avenue in northeast Reno County APAC-Kansas Inc. Shears Division, Hutchinson, $173,283.00.
160-13 KA 6362-01: Sidewalk ramp improvements in Ashland L & M Contractors Inc., Great Bend, Kansas, $189,924.20.
34-29 KA 6920-01: Chip Seal on K-34 from US 54 to US 400 Heft and Sons LLC, Greensburg, $198,440.50.
-
KDOT Lettings: April 2023
There are 17 projects up for bidding on April 19. Awarded bids announced on May 5 are highlighted in red. Awarded bids announced on June 7 are highlighted in blue.
Federal-Aid:
73-03 KA 3889-01: Replace bridge #014 over the Walnut Creek Drainage 4.55 miles northwest of the Thomas Road (former K-74) intersection. One-lane traffic through the work zone controlled by a temporary traffic signal. A M Cohron & Son Inc., Atlantic, Iowa, $3,761,811.91.
77-58 KA 3923-01: Replace the bridge over Fawn creek on US 77/K-9 and reconstruct the east approach. One-lane traffic through the work zone controlled by a temporary traffic signal. Reece Construction Company Inc., Salina, $4,401,271.86.
27 TE 0492-01: Construct a new Pedestrian/Bike Path along the west side of Grand Avenue (K-14) between Grace Avenue and the Smoky Hill River bridge. Reece, $738,189.51.
36-77 KA 5987-01: Grading and surfacing on Grant Steet between 5th and 7th in Atwood. (no plans)
40-100 KA 3914-01: Replace the South Fork Smoky Hill River bridge between Sharon Springs and Wallace. Bridges Inc., Newton, $4,515,189.72.
40-100 KA 3916-01: Replace the bridge over the Union Pacific Limon Subdivision between Weskan and Sharon Springs. Detour via K-27, I-70, and US 385, though local traffic will be diverted onto old US 40 into Sharon Springs. Bridges Inc., $5,467,745.01.
40-100 KA 4067-01: Replace the bridge over the Union Pacific Sharon Springs Subdivision west of Wallace. Traffic to be carried on a shoe-fly detour. Bridges Inc., $17,989,103.95.
69-11 KA 6619-01/400-11 KA 6620-01: 1/2-inch milling and 1.5-inch Overlay on US 69A/US 400 from K-66 north to US 69-160 and continuing north on US 69-160-400 to K-171. (US 69A segment is non-FA) Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $5,778,250.61.
15-87 KA 5793-01: Upgrade of the traffic signals at Southeast Boulevard and 31st Street in Wichita. Phillips Southern Electric Company Inc., Wichita, Kansas, $198,495.00.
Federal-Aid, Local Projects:
16 C 5074-01: Replace a wood bridge on a driveway off of old US 50 about 1 1/2 mile east of Old Beto Junction. Reece, $586,530.69.
30 C 5114-01: Replace the Osborne Road bridge over Eight Mile Creek. Dondlinger & Sons Construction Co. Inc., Wichita, $1,192,988.60.
87 N 0738-01: Repair the Zoo Boulevard bridge over the Big Ditch in Wichita. Dondlinger, $2,706,804.50.
Non-FA:
106 KA 6913-01: Mudjacking work in KDOT District 1 Raising Solutions LLC, Jefferson City, Missouri, $601,540.00.
23-32 KA 6904-01: Patching on K-23 between MM 136-139 in Gove County McCormick Excavation & Paving LLC, Stratton, Colorado, $157,228.50.
70-98 KA 6859-01: Lighting upgrades at the I-70 Rest areas east of WaKenney. Cooper Construction LLC, Emporia, Kansas, $172,254.50.
15-87 KA 6903-01: HMA Patching and a 2-inch overlay on the east Frontage Road of Southeast Boulevard from 47th Street to Clifton Avenue in Wichita. APAC-Kansas Inc. Shears Division, Hutchinson, Kansas, $216,035.00.